Need assistance or advice with a product or lead time? Call our friendly Customer Services Team on 0117 244 4099 for expert help.....oh and don't forget we price match on most products!
Tricel NOVOUK6GSR - 6 Person Economy Sewage Treatment Plant
Tricel NOVOUK6GSR - 6 Person Economy Sewage Treatment Plant
- £1,729.00 ex. VAT
- £2,074.80 inc. VAT
- Product Code: NOVO6GSR
The Tricel Novo 6GSR is an economy version of the Tricel Novo UK6 wastewater treatment plant.
This plant is only available with a gravity outlet and is supplied with a 12-month warranty on the blower and a 20-year warranty on the structure of the tank. The Novo SR is supplied with an IP66 connection socket and has a 12-month desludge period.
If you require a 3-year parts warranty, 18-month desludging interval, failure alarm or the option of a pumped outlet, please see the standard Tricel NOVOUK6.
The Tricel Novo submerged aeration plant is suitable for domestic and light commercial or communal applications and uses simple proven fixed bed technology. Each system comprises of 3 independent treatment zones, all fulfilling a different stage of the purification process.
Choosing the right sewage treatment plant is important, as in the case of a property alteration or extension, Building Control will strongly advise for a plant which is suitable for handling the increased flows and loads of the new development.
How a Tricel Novo Works:
Stage 1: The primary settlement chamber
In the first stage of sewage treatment, anaerobic breakdown takes place in the primary settlement chamber. The wastewater is introduced and the solids drop to the bottom, becoming separated from the liquid.
Stage 2: The aeration chamber
The next stage of the wastewater treatment involves aerobic breakdown. This takes place in the aeration chamber, where masses of naturally occurring bacteria inhabit specially designed filter media.
These bacteria are sustained with air, which is continuously supplied from a purpose-built pump in the unit’s top section. As the liquid flows slowly through the filter media, the bacteria feed on the waste and remove it from the liquid.
Stage 3: Final settlement chamber
In the last stage of wastewater treatment, the liquid flows from the aeration chamber into the final settlement chamber. Suspended sludge consisting of bacteria is carried with the liquid into the settlement chamber and settles to the bottom of the chamber.
From there, a continuous sludge return system pumps it back to the primary settlement chamber. The remaining treated liquid now meets the required standard to be safely passed out of the Tricel system.
Specification:
Model: | NOVO UK6GSR |
No. of People: | 1-6 |
Length (mm): | 2100 |
Width (mm): | 1640 |
Height (mm): | 2240 |
Nominal Inlet / Outlet Diameter (mm): | 110 |
Weight (empty) Kg: | 275 |
Inlet Invert To Base (mm): | 1375 |
Outlet Invert To Base (mm): | 1300 |
Inlet Invert To Ground Level (mm): | 535 |
Air Blower Rating (watts): | 60 |
Warranty Blower / Tank Structure (years): | 1 / 20 |
BOD5 (mg/l): | 11 |
SS (mg/l): | 16 |
NH4-N (mg/l): | 8 |
Options:
Tricel NOVO Risers - Risers increase the depth of the inlet into the treatment plant from groundlevel. The standard depth of this unit is 535mm. Using the options, this depth can be increased to either 785, 1035 or 1285mm.
Delivery Options:
FREE delivery of this product includes mainland England and Wales on an Economy 3-5 day service and is subject to suitable access for a large goods vehicle. Deliveries to Scottish Postcodes DD, DG, EH, FK, G, KA, KY, ML, PH and TD as well as Highlands AB, IV, KW and PA will incur a delivery charge, please contact us for a quote. This product is delivered to the kerbside. It is the customers' responsibility to provide suitable mechanical offloading facilities (eg. JCB excavator or loader) to offload this tank. If you need any assistance, please contact us on 0117 244 4099 prior to purchase - please remember we are here to help!
All tank orders are booked in with you prior to delivery, we will always try to achieve the earliest possible date and there will be an opportunity to change the suggested delivery date if necessary.
Please take a few moments to read the information below as we would like to ensure your delivery takes place as smoothly as possible:
We aim to deliver most tanks within 3-10 working days from order and payment, however some special orders (including large sewage treatment plants, underground tanks and steel products) may take longer. If your order is time critical please contact us before ordering so we can confirm delivery dates.
Parts are dispatched within 24 hrs subject to stock availability and please allow 2-3 days for delivery (depending upon location).
For convenience, all single skin and bunded plastic oil tanks up to and including 2500 litres in capacity are delivered on a vehicle with a tail lift to allow easy offloading at the kerbside. Please look for our "Free Tail Lift Offload" icon to confirm which products are included. Unless otherwise agreed by Tanks For Everything (TFE) offloading of all other products are the customer's responsibility.
Delivery will be between 07.30 and 18.30 on the expected delivery day. AM/PM Deliveries are available for some products, however these often incur an additional charge, please contact us for a quote before ordering if you require this option.
All orders will require a signature upon delivery.
FREE delivery includes all of England and Wales mainland destinations, however certain manufacturers charge extra for deliveries to Scotland and the Highlands. Please contact us on 0117 244 4099 for a delivery quote prior to ordering for these locations.
Deliveries of larger products (typically over 2500 litres) require delivery by an articulated vehicle. Please ensure the roads and access point to your delivery address are suitable for a 45ft long high sided articulated vehicle. If access is an issue please arrange delivery to a suitable alternative address where access will not be an issue. The ongoing delivery to the final destination will be your responsibility. If a delivery needs to be aborted, TFE reserves the right to pass on any additional delivery costs, so please if in doubt discuss this with us at time of order.
Whilst every effort will be made to deliver on the expected delivery date, TFE will not accept any charges for labour or compensation claims arising from failed deliveries. TFE strongly recommends that tanks and equipment are ordered in advance of installation allowing sufficient time for any issues to be addressed.
Please remember we are here to help and if we can be of any further assistance at any stage please do not hesitate to contact us on 0117 244 4099.
Tags: Tricel, NOVOUK6, Sewage Treatment plant,